Ten days in Denver

Five rebuilds. Ten days. One engineer.

Jaen personally designed, configured, installed, migrated, and completed five major network rebuilds across production, business, warehouse, hosted-client, and enterprise environments.

Discuss your project
5Major network rebuilds
10Days of field delivery
1Engineer from design through cutover
Little to noneDowntime at each site

The operating challenge

Five environments that normally require several specialist teams.

The work crossed routing, switching, wireless, firewalls, segmentation, identity, automation, cloud connectivity, physical infrastructure, production systems, and business-continuity planning. Each environment had a different set of dependencies and a compressed change window.

Work delivered

The systems were treated as one project.

  • Event and stadium campus: new routing, switching, 20 Gbps uplinks, and 23 VLANs
  • Company headquarters: a complete relocation supporting about 45 users
  • 120,000-square-foot warehouse: 28 access points and mobile operational workflows
  • MSP operations: new subnets, dedicated hosted-client firewall boundaries, and SOC 2-aligned separation
  • Enterprise network: switching, segmentation, FortiLink management, and cabinet replacement

Work personally delivered by Jaen Baldwin through another managed service provider. Client identities and sensitive infrastructure details are withheld.

Result

Complex changes completed without making the business absorb the complexity.

Each cutover was completed with limited to no downtime. After one overnight rebuild, the owner’s reaction was simple: the room looked completely different, and the employees did not know the network had changed. That is the standard: a major technical transformation with a calm business outcome.

Client identities and sensitive infrastructure details are withheld. The scope and outcomes shown here are included to demonstrate the level of work Jaen personally delivered.

Working through a similar change?

Tell Jaen what needs to change and what has to keep working. Start with the business outcome, the operating constraints, and the systems already in place.