Event and stadium campus case study

The digital foundation beneath a high-technology venue, rebuilt.

Jaen rebuilt the network supporting a large event and stadium campus, where business operations, live production, venue technology, security, staff systems, and guest-facing services had to perform together.

Discuss your project
23Purpose-built segmented VLANs
20 GbpsInfrastructure uplinks
CampusIndoor, outdoor, production, and stadium areas
1 engineerArchitecture through cutover

The operating challenge

An event campus cannot be designed like an ordinary office.

Production systems, venue operations, administration, physical security, building technology, and guest connectivity place different demands on the same infrastructure. Performance, isolation, failure containment, serviceability, and clean ownership all mattered.

Work delivered

The systems were treated as one project.

  • New routing and firewall policy
  • New managed switching with 20 Gbps infrastructure uplinks
  • Twenty-three segmented VLANs
  • Purposeful separation for production, operations, administration, security, venue technology, and guests
  • Migration planning designed for a live operating environment

Personally delivered by Jaen Baldwin through another managed service provider. Client identity and sensitive infrastructure details are withheld.

Result

A venue network built for the moments when everything converges.

The finished environment was faster, more secure, easier to support, and better matched to the reliability and security demands of a high-technology event campus. This was an architectural redesign, not a simple hardware refresh.

Client identities and sensitive infrastructure details are withheld. The scope and outcomes shown here are included to demonstrate the level of work Jaen personally delivered.

Working through a similar change?

Tell Jaen what needs to change and what has to keep working. Start with the business outcome, the operating constraints, and the systems already in place.