Automotive operations case study

Fourteen switches. One coordinated modernization.

A regional automotive operation needed more than a hardware swap. The switching platform, physical cabling, rack organization, migration sequence, and ongoing serviceability had to be rebuilt together.

Led by Jaen through another MSP
Completed infrastructure from the anonymized engagement
01 / CONSTRAINTS

What made the engagement difficult

  • A large operational footprint spanning business and service functions
  • Existing wiring and racks that were difficult to trace and maintain
  • A live environment where extended disruption would affect revenue
  • Multiple switching locations requiring consistent standards
02 / EXECUTION

What Jaen led

  • Led deployment of fourteen Fortinet 400-series switches
  • Planned the modernization and cutover as one coordinated change
  • Rebuilt patching, cabling, and physical rack organization
  • Validated the environment for supportability after migration
03 / RESULT

What changed for the organization

  • Dramatically clearer physical and logical infrastructure
  • Improved visibility and troubleshooting across the switching environment
  • A consistent managed platform with room for future growth
  • Lower risk during future maintenance and change

Why it matters

A successful refresh does not merely replace old equipment. It leaves the next engineer with an environment that can be understood, supported, and trusted.